Return
Print
Email
FLEXTIME IMPACT-LARGE
005-Flextime_01.png

FLEXTIME IMPACT-LARGE by Watson Gloves

Call For Price
  • Part Number: 4083FTK
  • UPC:
  • Availability: Call to check availability
Quantity:
Add To Cart
Add To Estimate
Add To Wishlist
Compare Item
Product Variations (3)
Product Overview
Info & Guides
Dryhide™ water resistant full-grain goatskin leather palm is hard wearing and durable providing great dexterity. Heavy duty rubber on back of hand, fingers and knuckle bar provides impact protection. Hooded fingertips and thumb for added reinforcement and protection in critical wear areas. Spandex stretch back is flexible and provides form-fitting memory. Touchscreen compatible fingertips can be used on all touch screen devices. Snug-fitting elastic wrist and secure Velcro® closure keeps out dirt and debris.
Specifications
Details
Industrial Category:
Safety
Industrial Subcategory:
Gloves and Hand Protection
Industrial Subtype:
Synthetic Gloves
Applications:
Automotive, Construction, Equestrian, Gardening & Landscaping, General Purpose
Back Material:
Spandex with TPR
Brand:
Work Armour
Closure Type:
Velcro®
Colour:
Black/Tan
GTIN:
065537865157
Item Height inches:
1
Item Length inches:
9
Item Quantity:
1
Item Weight lbs:
0.45
Item Width inches:
4
Package Height inches:
13.4
Package Length inches:
25.6
Package Quantity:
72
Package Type:
BOX
Package Weight lbs:
32.4
Package Width inches:
13.4
Palm Material:
Goatskin
Product Series:
Work Armour
Short Description:
Dryhide™ water resistant full-grain goatskin leather palm is hard wearing and durable providing great dexterity Spandex stretch back is flexible and provides form-fitting memoryLeather hooded fingertips and reinforced thumb.
Size:
L
Spec Sheet:
https://www.watsongloves.com/wp-content/uploads/2019/07/005TPR-Flextime_Spec-Sheet_NP.pdf
Thumb Type:
Wing
UNSPSC:
46181504
UNSPSC Number:
46181504
Manufactured By:
Watson Gloves
Other Details
Dryhide™ water resistant full-grain goatskin leather palm
Heavy duty rubber on back of hand, fingers and knucle bar
Hooded fingertips and thumb
Snug-fitting elastic wrist
Spandex stretch back
Recently Viewed Items
To: From: Subject: